Tuesday, 30 October 2012

Week 10

Troubleshoot circuit


In this week, what we plan is to check troubleshoot the circuit. But, at the same time, we decide to prepare fyp report. In the report, we need to follow the guidelines that can refer to website fyp.bmi.unikl.edu.my.

Objective :
> Carry out an inspection on a circuit if there is short circuit
> Look at assembly of each component with polarity
> Check the current circuit from input to output circuit

Content / Procedure :
> Do troubleshoot using a multimeter
> When do troubleshoot must refer to schematic diagram
> Referring technician for help

Result and Analysis :
> Problem can be detected
> Troubleshoot very important in the project because every problem that occur can be detected

 So, after we solder the component, we check and analyze that it's have a problem at the circuit. In our operation project, "when water bridges the tracks, base current flows and switch on the transistor, sounding the alarm." But our problem is when we connect the battery at the circuit, its sounding and led is lights up before the probes touches the water. So, our solution is to create a new simple circuit which follow the concept project when detect the water, the led will be lights up and sound the alarm. 

So, this is circuit that we doing to troubleshoot the problem of circuit to detect and solve it.

This is new circuit that we make renovation to solve the circuit problem 



Conclusion :
> After finish the troubleshoot at our project, we can solve the problem on a circuit and we are also able to detect every problem in the circuit.



No comments:

Post a Comment